A new VA control system was specified which would connect the existing network of speakers and wiring which had been tested okay. The swap over was planned for a night after the trams had stopped running and the station was unoccupied.
Utilising equipment which was compliant to EN5416, our engineers built and tested a new equipment rack at our workshops prior to delivering it to site. The changeover was carried out with minimal fuss working alongside fire alarm engineers to ensure the two systems were talking to each other.
Working alongside ADT FIre & Security engineers, testing and commissiong was carried out which established the system to be above the minimum intelligibility required for voice evacuation systems and far is excess of that provided previously by the old equipment.
Our involvement with Metrolink and ADT also extends to the maintenance depot for trams which has a public address system covering the engine sheds and external areas which was fitted several years ago when the building was constructed.
PAS were called into Chester Zoo in 2005 to assess problematic and underperforming sound systems in several areas of the site...